
01 / Earthworks
Earthworks
Excavators work along the pond bank as the ground is shaped and the wall takes form.
Pond work · Grading · Retaining wall
Follow the pond edge from excavation and wall construction to the finished bank.

The project brings several parts of the work into one continuous shoreline: earthmoving along the bank, retaining wall installation, and the finished ground above. The photos show both the construction and the completed appearance.
The date above is when Brad shared these photos.

01 / Earthworks
Excavators work along the pond bank as the ground is shaped and the wall takes form.

02 / Wall installation
The retaining wall follows the water’s edge. The upper bank is still under construction in this view.

03 / Finished shoreline
A grassed upper bank, defined retaining wall, and stone along the water bring the finished edge into view.
Let’s talk about the ground ahead